In any engineering office or construction site, project drawing
control facilitates the quick and effective review and approval
process.
Project drawing control also ensures that revised documents are
promptly distributed to the appropriate recipients..
When a revised document is received, the recipient needs to mark
all previous drawings as ‘superseded’.
The
QDMS
software package provides project drawing control to project
management teams globally, saving time and reducing costs normally
associated with lengthy approval processes and complex
distribution methods.
The
TeamBinder
solution accelerates the revision process by allowing project
members to simultaneously review and approve drawings, from
various locations.
With
QDMS
project drawing control, users have the option to conduct the
drawing revision in ‘series’ – where the drawing has to be
reviewed by one engineer/authority before it can go on to the
next, or in ‘parallel’ – where multiple members can review the
drawing simultaneously. Both workflows reduce delays in design
reviews, thus expediting the entire design process.
To conduct a smooth drawing control process, it is fundamental
that:
- All necessary project members are aware of the project
drawing control process
- The project control drawing system is easy to use and
records all registered documents, along with their approval
status and any comments
-
The project control drawing
system is fast and efficient, with less than 0.1% downtime
-
Access requirements and
workflow can be setup to suit the current project
QA Software recommends
TeamBinder
for web-based document management system software and
QDMS/QTRAK
for LAN and non web-based systems.
|