A vendor data requirement schedule is an itemized list of vendor data requirements for a package or requisition. Generally the vendor data requirements are selected from the standard library for both speed and accuracy purposes. Initially the VDR schedule is defined as “Pre-award” so it can be included as part of a bid package document. Once a contract is awarded, the status changes to “Post-award” for ongoing control. Against it each vendor data requirement (VDR) it is possible to define: Purpose: This is typically used to distinguish between issues of vendor data as preliminary and certified. Format: Used to specify the format in which the vendor data is to be supplied. Copies: Used to specify the number of copies to be submitted. Weeks After: Used to specify when the vendor data is required in relation to defined Milestones. 4A for example indicates that this item is required 4 weeks after award milestone. –2D would mean two weeks before delivery. With Bid: Preliminary data to be submitted together with the bid. With MDR: To be submitted together with the Manufacturing Data Record. With IOM: To be submitted together with the Installation and operating manuals. Details: Details associated with this VDR Code. Response Period: Days required for a response.
|